Widgets Magazine
Results 1 to 8 of 8

Thread: SW corner of NW 25 and Walker

  1. #1

    Uptown/23rd SW corner of NW 25 and Walker

    Residential Development by Marva Ellard

  2. #2

    Default Re: SW corner of NW 25 and Walker

    Geotechnical investigations underway today.

  3. #3

    Default Re: SW corner of NW 25 and Walker

    Quote Originally Posted by Paseofreak View Post
    Geotechnical investigations underway today.
    What does that mean?

    Taking soil core samples?

  4. #4

    Default Re: SW corner of NW 25 and Walker

    Yes. Typically augering to collect split-spoon soil samples and conducting drive hammer testing to estimate shear strength of the soils encountered. Also water levels will be recorded if present.

  5. #5

    Default Re: SW corner of NW 25 and Walker

    Interesting. Thanks for posting this.

    I'll keep my eye out for the design application.

  6. #6

    Default Re: SW corner of NW 25 and Walker

    Quote Originally Posted by Paseofreak View Post
    Yes. Typically augering to collect split-spoon soil samples and conducting drive hammer testing to estimate shear strength of the soils encountered. Also water levels will be recorded if present.
    Paseo, that's very interesting but not everyone understands your technospeak.

  7. #7

    Default Re: SW corner of NW 25 and Walker

    Sorry, basically it's collecting 18" long vertical segments of soil in a 2" diameter sleeve. The samples are typically collected a five foot depth intervals. Sampling depth is dictated by the size and type of foundation and anticipated loads. The sampling sleeve is split lengthwise. A cap on the top and a threaded ring with a beveled edge on the bottom hold the two side of the sleve together during sampling and are removed to split the sleeve and retrieve the samples.

    An eight inch hollow auger is used to bore down to the top of the intended sampling zone. With the auger still in the ground, a plug (to prevent the hollow stem of the auger from filling with soil as the auger is advanced) is removed from the bottom of the auger. The sleeve is attached to a piece of drill steel and lowered down the hollow stem of the auger to rest on the soil at the bottom of the hole. A 140 lb. weight (hammer) is repeatedly dropped 30"' to impact the top of the drill steel protruding from the top of the auger, forcing soil into the sleeve. The driller records the number of blows required to push the sampling sleeve through each of the three six inch segments of the 18 inch long sample. The sleeve and drill steel are then removed. The plug can be be replaced and additional sections of auger can be added to continue boring to collect deeper samples.

    From the number of blows recorded, the engineer can estimate the strength of the soil. Laboratory tests are performed to classify the soils in the collected samples and indicate how they will behave as a construction material and how they will react to water.

  8. Default Re: SW corner of NW 25 and Walker

    Technospeak?


Thread Information

Users Browsing this Thread

There are currently 1 users browsing this thread. (0 members and 1 guests)

Similar Threads

  1. 816 N. Walker
    By Pete in forum Development & Buildings
    Replies: 90
    Last Post: 06-27-2022, 02:25 PM
  2. 100 N. Walker
    By hoya in forum Development & Buildings
    Replies: 24
    Last Post: 12-13-2012, 11:29 AM
  3. I-240 and Walker
    By okclee in forum General Civic Issues
    Replies: 5
    Last Post: 07-02-2007, 10:36 PM
  4. Memorial and Walker
    By kmf563 in forum Suburban & Other OK Communities
    Replies: 0
    Last Post: 06-11-2007, 02:06 PM
  5. I-240 and Walker
    By Keith in forum General Civic Issues
    Replies: 15
    Last Post: 03-29-2007, 05:25 PM

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  
Single Sign On provided by vBSSO