Thread: Odot

  1. #676

    Default Re: Odot

    From the ODOT twitter account today: https://twitter.com/OKDOT/status/1233489585776332801

    OKC: We're looking for your feedback on the potential redesign of I-35 between I-40 and I-44 in OKC. For the the survey: http://ow.ly/RVw950yyVbf
    Direct link to the survey: https://i-35improvements.metroquest.com/

  2. #677

    Default Re: Odot

    Quote Originally Posted by David View Post
    From the ODOT twitter account today: https://twitter.com/OKDOT/status/1233489585776332801



    Direct link to the survey: https://i-35improvements.metroquest.com/
    Thanks for that!

  3. Default Re: Odot

    Since there is only a short distance where the residential crowds the highway, they could cantilever a lane of the access road over a shoulder of a 3-lane-each-side l-35.

  4. #679

    Default Re: Odot

    ^^^^ and what about when they need to expand it to 8, 10, or more lanes in the future? If it’s already this tight for a six lane widening OkDOT is doing the smart thing by buying ROW when it’s cheap.

  5. #680

    Default Re: Odot

    The 25 year long term plan needs input and here is some information on it with a link to take a survey. I already did but since OkDOT hates me they probably won't care about my opinion lol

    https://www.oklongrangeplan.org/

  6. #681

    Default Re: Odot

    Details for the next phase of the I-40 widening and modernization project are being released. Some notable information is a full roundabout interchange at McLoud Rd, a small two way service road by the casino, and sadly finances have delayed this project with all 3 phases not set to be fully finished until 2027 or so. Hopefully it gets pushed up a couple years.

    Map:


    3D fly through of the project: https://clients.freese.com/ODOTI40Po...07_23_2020.mp4

    OkDOT: https://www.ok.gov/triton/modules/ne...ticle_id=60881

  7. #682

    Default Re: Odot

    Quote Originally Posted by David View Post
    The meeting handouts and further details can be found for download at: https://www.ok.gov/odot/Programs_and.../20200218.html.

    Honestly, what the hell are they thinking with that alternative 4 in particular? Hey, why don't we pave over every single stretch of retail and housing that happens to be next to the interstate, but not with more interstate but with giant, wide-ranging frontage roads.
    As expected, alt. 4 has been dropped from consideration and ODOT will only be considering 2 and 3.

    I-35 widening between I-40 and I-44.
    https://www.odot.org/meetings/a2020/200218/update.pdf

  8. #683

    Default Re: Odot

    Also regarding I-40 in the eastern metro the preferred alternative for Douglas Blvd interchange has been selected as the SPUI. Construction starts 2025.



    https://www.odot.org/meetings/a2017/...lyer072020.pdf

  9. #684
    HangryHippo Guest

    Default Re: Odot

    Quote Originally Posted by Plutonic Panda View Post
    As expected, alt. 4 has been dropped from consideration and ODOT will only be considering 2 and 3.

    I-35 widening between I-40 and I-44.
    https://www.odot.org/meetings/a2020/200218/update.pdf
    Good. When is the expansion scheduled to begin?

  10. #685

    Default Re: Odot

    Quote Originally Posted by Nick View Post
    Good. When is the expansion scheduled to begin?
    2026/2027 :/

  11. #686
    HangryHippo Guest

    Default Re: Odot

    Quote Originally Posted by Plutonic Panda View Post
    2026/2027 :/
    Of course. : (

  12. #687

    Default Re: Odot

    Quote Originally Posted by Nick View Post
    Of course. : (
    Even before the COVID pandemic OkDOT was already pushing projects back. Projects like the Douglas Blvd interchange and Waterloo road schedule for 2020/21 were pushed back several years. The I-35 widening stayed the same regarding its schedule. I swear I read somewhere that the entire I-40 widening to Shawnee was supposed to be done around 2023 or so. Now it’s 2027.

  13. #688

    Default Re: Odot

    Quote Originally Posted by Plutonic Panda View Post
    Details for the next phase of the I-40 widening and modernization project are being released. Some notable information is a full roundabout interchange at McLoud Rd, a small two way service road by the casino, and sadly finances have delayed this project with all 3 phases not set to be fully finished until 2027 or so. Hopefully it gets pushed up a couple years.

    Map:


    3D fly through of the project: https://clients.freese.com/ODOTI40Po...07_23_2020.mp4

    OkDOT: https://www.ok.gov/triton/modules/ne...ticle_id=60881
    I like that they are experimenting with the roundabout interchanges. Do we have any of those elsewhere in Oklahoma?

    Quote Originally Posted by Plutonic Panda View Post
    As expected, alt. 4 has been dropped from consideration and ODOT will only be considering 2 and 3.

    I-35 widening between I-40 and I-44.
    https://www.odot.org/meetings/a2020/200218/update.pdf
    Excellent. Of the two remaining options I prefer alt. 2, but only mildly so compared to alt. 3.

  14. Default Re: Odot

    So are they proposing putting this before the widen I-40 between Air Depot and the 240 junction? If so, that seems to be a plan that's backwards....

  15. #690

    Default Re: Odot

    Quote Originally Posted by bombermwc View Post
    So are they proposing putting this before the widen I-40 between Air Depot and the 240 junction? If so, that seems to be a plan that's backwards....
    on the current ODOT 8 year plan (new one comes out in OCT) that portion of I-40 is also in 2027

  16. #691

    Default Re: Odot

    Quote Originally Posted by BoulderSooner View Post
    on the current ODOT 8 year plan (new one comes out in OCT) that portion of I-40 is also in 2027
    Are you sure? I don’t see that portion.

  17. #692

    Default Re: Odot

    Quote Originally Posted by plutonic panda View Post
    are you sure? I don’t see that portion.
    i-40: From the douglas interchange, extend east 5.0 miles
    jp# 3101105 ffy 2027 grade, drain & surface $ 25,500,000

  18. #693

    Default Re: Odot

    That’s East. Wouldn’t Air Depot Road be west?

  19. #694

    Default Re: Odot

    Quote Originally Posted by Plutonic Panda View Post
    That’s East. Wouldn’t Air Depot Road be west?
    that is douglas to 240 the section from just east of eaker gate to just west of Douglas (1/2 mile ) currently has no plans to be widened

  20. #695

  21. #696

    Default Re: Odot

    ODOT has a refreshed website with the new state branding.

  22. #697

    Default Re: Odot

    An ODOT website that doesn't look like it's from the 90s? What madness is this?

  23. #698

    Default Re: Odot

    I wish OkDOT would build some wildlife bridges around the state.

    https://www.kcrg.com/2020/11/24/watc...just-for-them/

  24. #699

  25. #700

    Default Re: Odot

    Quote Originally Posted by BoulderSooner View Post
    I believe this is still last years. 2021-2028 8 year plan is being presented for approval on 12/7 at the ODOT Commission Meeting.

Thread Information

Users Browsing this Thread

There are currently 81 users browsing this thread. (0 members and 81 guests)

Similar Threads

  1. OKC odot 2012 update
    By BoulderSooner in forum Transportation
    Replies: 0
    Last Post: 01-18-2012, 10:06 AM
  2. ODOT YouTube Channel.
    By Dulahey in forum Transportation
    Replies: 12
    Last Post: 01-12-2012, 10:01 AM
  3. Beware as a tenant being relocated by ODOT.
    By Sooner_Fan in forum General Civic Issues
    Replies: 4
    Last Post: 07-29-2010, 09:51 PM
  4. ODOT Traffic Camera Access
    By kd5ili in forum Transportation
    Replies: 11
    Last Post: 09-24-2009, 05:27 PM
  5. Replies: 8
    Last Post: 08-04-2007, 12:24 PM

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  
Single Sign On provided by vBSSO