What about that Santa Fe Bridge? I thought they were supposed to do it before this other stuff - it is present in that picture but can't tell they've done much on it (besides move some utilities maybe).
What about that Santa Fe Bridge? I thought they were supposed to do it before this other stuff - it is present in that picture but can't tell they've done much on it (besides move some utilities maybe).
Right, but the sole function of OTA is to finance construction and maintenance via bonds. They were created for that purpose. They have a revenue source independent from the state which are the tolls collected. Thus, they are exempt from the requirements attached to tax collections. No toll revenue is used to maintain state and federal roads.
Continue the Renaissance!!!
I know this has already been said, but it would've been nice if they could've somehow replaced the cloverleaves on the west side with fly over ramps. I don't think the space is there though due to the Paragon Building being in the way.
Turner Turnpike was completed in 1953 before the U.S. began nationwide construction of the interstate highway system. It was signed as Interstate 44 in 1958 but still possesses the Turner Turnpike name. The H.E. Bailey Turnpike opened in 1964 but wasn't signed as I-44 from OKC to Lawton until 1982. Will Rogers Turnpike was opened in 1957 but wasn't signed as I-44 until 1958. Thus, they are only signed as an Interstate highway. They were not federally funded nor taxpayer paid, but built with bonds that were repaid with toll revenue.
Continue the Renaissance!!!
Okay, so lets get back to the subject of an interchange that has absolutely nothing to do with turnpikes and is nowhere near a turnpike--at least 5 miles or more away.
yea, it is like they have not learned anything from the past failure on that location, get rid of the clover leaves now. If they would have given up on the complexity added by having exits and entrances from 63 it would be in the budget.
Are they going to do anything about that area under the railroad tracks that floods so badly?
Regarding flooding, probably not. This will only be to make the interchange able to handle higher amounts of traffic and not create a bottleneck.
They are planing to eventually widen i235 from 36th to the interchange if that is the part under the railroad you are talking about but no idea of time on that. Since they will have to replace (at least part of) the bridges for the santa fe exit, 50th and the rail road due to them all being to narrow to do that it will be surprising if it does actually happens in the 8 year plan time frame since it looks like they want to do the interchange first.
the plan is to do do the southboud 235 to west 44 ramp this year then do the 36st to the interchange bridges and road starting in 2017 then start the rest of the interchange in 2018 .... not on this list is the North 235 to east 44 ramp that i guess will come in 2019 outside of the 8 year plan
GRADE,DRAINING,BRIDGE & SURFACE
I-235: SOUTHBOUND TO WESTBOUND OFF RAMPS AT THE I-235/I-44
09033(40) FFY 2011 INTERCHANGE (PHASE 2A) REMAINING DIV 4 CIP FUND MATCH
OKLAHOMA Div. 4 IS235 0.050 Mi. Let 01/2011 $24,771,508
UTILITIES
I-235: NW 50TH AND BNSF BRIDGES AND APPROACHES (SEGMENT 4A) UT FOR
09033(12) FFY 2012 09033(16)
OKLAHOMA Div. 4 IS235 0.200 Mi. Let 11/2011 $257,500
GRADE,DRAINING,BRIDGE & SURFACE
I-235: NW 50TH AND BNSF BRIDGES AND APPROACHES (SEGMENT 4A)(100%
09033(16) FFY 2017 IM)
OKLAHOMA Div. 4 IS235 0.200 Mi. $7,760,267
GRADE,DRAINING,BRIDGE & SURFACE
I-235: MAINLINE FROM NW 36TH STREET INTERCHANGE TO NORTH OF NW 50TH
09033(25) FFY 2017 (SEGMENT 7) (S-48)(H-88,89)
OKLAHOMA Div. 4 IS235 0.500 Mi. $15,450,000
GRADE,DRAINING,BRIDGE & SURFACE
I-235: NBOUND TO WBOUND FLYOVER BRIDGE I-235/I-44 INTERCHANGE
09033(11) FFY 2018 (SEGMENT 2B)
OKLAHOMA Div. 4 IS235 0.500 Mi. $17,000,000
GRADE,DRAINING,BRIDGE & SURFACE
I-44: EAST BOUND TO SOUTH BOUND RAMPS AT I-235/I-44 INTERCHANGE.
09033(13) FFY 2018 (PHASE 3B)
OKLAHOMA Div. 4 IS044 0.100 Mi. $7,229,493
I don't know if it means anything, but Ive seen some construction signs starting to be placed around the interchange. even saw one that uses digital messages
digital signs all around the interchange that construction to start June 20th
Yeah, I saw some going westbound on 44 right before the Lincoln bridge. I was wondering it they were for that south to west ramp. That's the only thing they're going to be doing.
Lots of tree clearing already happening.
Man this is going to be a mess.. I already can't wait for it to be done!
There are currently 3 users browsing this thread. (0 members and 3 guests)
Bookmarks