I have doubts about at grade or below grade; below grade under a river, then either side of the bridge is already pretty high and there is not much reason to mess with the city streets height either. They have tones of ROW to start from with like forty feet on either side, plus if they move the lanes to the center and the exits to the right hand lanes.
Bookmarks