Guess the additional levels are out of steel ? Never seen parking garages built like that.
In a situation like this, steel equates to a much faster construction time, creates less disruption on the existing day to day operations, and means a much faster turn around time.
Ironicaly, the dowell garage is basically this type of structure (steel), only wrapped in cinder block and it's taking forever to build a second one...
They aren't messing around (from https://twitter.com/dtOKCbuilds):
![]()
Are they going to pour a thin deck of concrete on the metal floors ?
That didn't take long! (from https://twitter.com/dtOKCbuilds)
![]()
Nice!!! Btw love those rainbow colors reflecting off that building to the left.![]()
Oh lol. Still looks great!
yeah haha... I actually like it now.
I have noticed they are putting some new stone on the corners. It looks like it will stick out more from the corners going to the top.
From catch22:
Couple of nice ones from our man Will:
Was down there this weekend, guess I didn't look up. Was hoping for better integration, but that's not terrible. And it was fast. Which is what was needed.
Looks like they are getting very close to wrapping this up (from https://twitter.com/dtOKCbuilds):
![]()
They have started telling people they can park on the 6th and 7th floors.
Looks like they are largely complete (thanks to warreng88 for the photo):
![]()