Widgets Magazine
Page 75 of 79 FirstFirst ... 2570717273747576777879 LastLast
Results 1,851 to 1,875 of 1952

Thread: The New I-40 (Construction Updates)

  1. #1851

    Default Re: The New I-40 (Construction Updates)

    Quote Originally Posted by gurantula35 View Post
    does anyone else feel that the 60mph speed limit here is too slow? just east on i40 is 65mph with three lanes.

    I'm sure it bothers me because i'm an impatient driver but does anyone else feel its too slow?
    No

  2. #1852

    Default Re: The New I-40 (Construction Updates)

    Quote Originally Posted by gurantula35 View Post
    does anyone else feel that the 60mph speed limit here is too slow? just east on i40 is 65mph with three lanes.

    I'm sure it bothers me because i'm an impatient driver but does anyone else feel its too slow?
    Yes.

    It needs to be 70 or 75. It's ridiculous how slow people drive in this city.

  3. #1853

    Default Re: The New I-40 (Construction Updates)

    In fact, ODOT originally planned to have the speed limit at 70MPH... not sure what happened to that.

  4. #1854

    Default Re: The New I-40 (Construction Updates)

    Quote Originally Posted by Plutonic Panda View Post
    Yes.

    It needs to be 70 or 75. It's ridiculous how slow people drive in this city.
    And I assume you aren't people?

  5. #1855

    Default Re: The New I-40 (Construction Updates)

    Quote Originally Posted by ljbab728 View Post
    And I assume you aren't people?
    I just mean the majority. I was behind two people on the stretch of I-35 that is four lanes in OKC who were going 50MPH. Very annoying.

  6. #1856

    Default Re: The New I-40 (Construction Updates)

    Quote Originally Posted by Plutonic Panda View Post
    I just mean the majority. I was behind two people on the stretch of I-35 that is four lanes in OKC who were going 50MPH. Very annoying.
    I understand that, pluplan. But just because some people drive much under the speed limit doesn't mean the speed limit needs to be raised to 90.

  7. #1857

    Default Re: The New I-40 (Construction Updates)

    Quote Originally Posted by Plutonic Panda View Post
    I just mean the majority. I was behind two people on the stretch of I-35 that is four lanes in OKC who were going 50MPH. Very annoying.
    One of them was me....
    The gal ahead of me was texting and only doing 45.

  8. #1858

    Default Re: The New I-40 (Construction Updates)

    Quote Originally Posted by Achilleslastand View Post
    One of them was me....
    The gal ahead of me was texting and only doing 45.
    oh maaaan. If had known that, I wouldn't have followed yas and slashed your tires. My bad man

  9. #1859

    Default Re: The New I-40 (Construction Updates)

    Quote Originally Posted by ljbab728 View Post
    I understand that, pluplan. But just because some people drive much under the speed limit doesn't mean the speed limit needs to be raised to 90.
    you're right... It needs to be raised to 190!!!!

  10. #1860

    Default Re: The New I-40 (Construction Updates)

    Once upon a time, the speed limit for the entire state of Oklahoma was defined in law simply as "reasonable and proper." This left it up entirely to the whim of any county mountie or constable or trooper, who could claim that 20 MPH was "too fast for conditions" (which it often is, if driving on glare ice)...

  11. #1861
    HangryHippo Guest

    Default Re: The New I-40 (Construction Updates)

    If there is a better thread for this question, feel free to move it. I just couldn't find it via search if it exists.

    Does anyone know when they will be done with the I-40 expansion and reconstruction between Sara Rd. and Garth Brooks Blvd. and will have the retaining barriers removed? I tried to navigate ODOT's website to find out, but that thing is a piece of junk and damn near unusable to find construction updates.

  12. #1862

    Default Re: The New I-40 (Construction Updates)

    Quote Originally Posted by Hemingstein View Post
    If there is a better thread for this question, feel free to move it. I just couldn't find it via search if it exists.

    Does anyone know when they will be done with the I-40 expansion and reconstruction between Sara Rd. and Garth Brooks Blvd. and will have the retaining barriers removed? I tried to navigate ODOT's website to find out, but that thing is a piece of junk and damn near unusable to find construction updates.
    They are getting close to being completed with I-40 itself. It looks like the last thing that will be finished is the bridge over I-40 on Mustang Rd. When on I-40, you are now driving on the new surfaces, I could see all lanes open within a month...this is just a guess, but it's getting close.

  13. #1863

    Default Re: The New I-40 (Construction Updates)

    Instead of opening all lanes in a month, it may be in this coming week, as tonight they are removing the temporary concrete barriers on I-40. Hopefully all lanes will be open soon.

  14. #1864

    Default Re: The New I-40 (Construction Updates)

    Quote Originally Posted by Bellaboo View Post
    Instead of opening all lanes in a month, it may be in this coming week, as tonight they are removing the temporary concrete barriers on I-40. Hopefully all lanes will be open soon.
    Even if instead of just dropping to two lanes, would divert a third lane with the people who will be getting off at the turnpike/mustang road it would be a big improvement to keep the area from backing up.

  15. Default Re: The New I-40 (Construction Updates)

    Does anyone know what they are doing on eastbound I-40 just east of the I-35 (Dallas) junction? It looks like they are grading some diversion lanes down the hill which seems a very weird thing to do. I can't figure out how this ties into the Boulevard exit, so I wondered if they weren't reworking the southbound exit from westbound I-35 to make traffic move faster through there. Anyone know?

  16. #1866

    Default Re: The New I-40 (Construction Updates)

    Quote Originally Posted by ChaseDweller View Post
    Does anyone know what they are doing on eastbound I-40 just east of the I-35 (Dallas) junction? It looks like they are grading some diversion lanes down the hill which seems a very weird thing to do. I can't figure out how this ties into the Boulevard exit, so I wondered if they weren't reworking the southbound exit from westbound I-35 to make traffic move faster through there. Anyone know?
    Maybe it is the Boulevard's entrance on to I-35 south?

  17. #1867

    Default Re: The New I-40 (Construction Updates)

    I didn't see anything on the east side of 35, but on the west side, they are working on the ramp that will come from the boulevard onto I-40 EB in the I-35 SB exit lane. Might that be what you saw?

  18. Default Re: The New I-40 (Construction Updates)

    No, this is east of the I-35/I-235 interchange on the north side of the east bound lane of I-40 (in the center median). I can't figure out what they are doing.

  19. #1869

    Default Re: The New I-40 (Construction Updates)

    Quote Originally Posted by ChaseDweller View Post
    No, this is east of the I-35/I-235 interchange on the north side of the east bound lane of I-40 (in the center median). I can't figure out what they are doing.
    Is this a westbound entry into downtown via the new boulevard ? They have all kinds of bridges being built in the area.

  20. #1870

    Default Re: The New I-40 (Construction Updates)

    Quote Originally Posted by Bellaboo View Post
    Is this a westbound entry into downtown via the new boulevard ? They have all kinds of bridges being built in the area.
    Better not. I will be furious if a new exit or entry is built on the left side of the highway. That is dump and screws up traffic. A lot of our interchanges need to be fixed in this regard.

  21. #1871

    Default Re: The New I-40 (Construction Updates)

    They placed the concrete for the East bound boulevard off ramp / onramp to I-40 today.

  22. #1872

    Default Re: The New I-40 (Construction Updates)

    The timed lighting for on/off ramps on i40 is so freaking bad. It gives even amounts of timing for all directions no matter the time of day, this causes huge backups during certain times of day. Anybody know when this issue will be addressed?

  23. #1873

    Default Re: The New I-40 (Construction Updates)

    Does anyone know why some of the signs on the new i40 have what appears to small electronic screens above each lane? Looks to be some kind of lane indicator but I have never seen them turned on in the now 3 years this road has been open. Seems like a waste of money since they have never been used.

    Would be curious to know why they were added but then never used.

  24. #1874

    Default Re: The New I-40 (Construction Updates)

    Quote Originally Posted by DowntownMan View Post
    Does anyone know why some of the signs on the new i40 have what appears to small electronic screens above each lane? Looks to be some kind of lane indicator but I have never seen them turned on in the now 3 years this road has been open. Seems like a waste of money since they have never been used.

    Would be curious to know why they were added but then never used.
    Oklahoma's traffic information system has always been a very slow work in progress. It was years before they built the traffic speed sensors that allowed the information boards to give ETA information to certain parts of the city. The lane close indicators are probably also dependent on a future system not yet developed or built. I doubt there is currently an easy way to trigger those lane signs on and off.

  25. Default Re: The New I-40 (Construction Updates)

    I drive on the Crosstown everyday to work and back and while the speed limit says 60, many drivers go at 70 mph, so it's not like they're strictly enforcing it. But you have to be careful, the motorcycle cops and state highway patrol cars are always on the lookout for those going any faster. I see drivers that have been pulled over almost daily on that stretch. The motorcycle cops actually make themselves visible standing on the left shoulder of the highway with their speed guns pointed at traffic.

Thread Information

Users Browsing this Thread

There are currently 34 users browsing this thread. (0 members and 34 guests)

Similar Threads

  1. new edmond highway
    By metro in forum Suburban & Other OK Communities
    Replies: 18
    Last Post: 11-17-2006, 07:34 PM
  2. Replies: 16
    Last Post: 01-19-2006, 09:07 AM
  3. OU Construction
    By BG918 in forum Suburban & Other OK Communities
    Replies: 14
    Last Post: 11-15-2005, 09:08 AM
  4. Construction at the airport
    By Patrick in forum General Civic Issues
    Replies: 17
    Last Post: 08-09-2004, 07:52 PM

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  
Single Sign On provided by vBSSO