About ODOT letting the contract from Penn to Western in August? There was always little to no chance that could actually be stopped. There is somewhat more of a chance to do something about the elevated bridge from Western to just short of Walker. So far there is no additional lettings scheduled through October.
Western to Penn plan sheets:
http://www.okladot.state.ok.us/contr...ULL%20FILE.pdf
To sum up: removal of concrete barrier and roadway along median, reduce roadway to 4 lanes(2 lanes each direction), plant sod in center of median, "rehabilitate" Penn, Virginia, Indiana, Blackwelder, and Sheridan off-ramp bridges, repave roadway with asphalt, new lighting, and reduce speed to 45mph.