    Are there other people out there like me who like to drive down (or up, or over) every few months and check out the construction of the new Crosstown? Or am I alone on this one?

    I looked through the current 11 pages of this forum and could not find a single thread pertaining to the ongoing construction of this project.

    So if interested, please respond. I went on Saturday to check it out & I was going to go on Sunday and take some pics to hopefully post for those who do care, but I didn't. Anyway, if any of you have taken the time to notice the bridge and bridge piers being constructed over Agnew Avenue, my question to you is, the main bridge...is that all of it? Only because they say that this is going to be a 10 lane project and that sure doesn't look like 10 lanes. There is the little eastbound bridge on the south end of that project that will connect into the future boulevard but I was wondering if they are going to build another bridge (hence, they are currently adding on to the north end of the bridge over May Avenue to either make additional running lanes for the I-44 northbound exit or they are scooting the current I-40 over to be able to make room for tying in the new Crosstown in with the current Crosstown).

    If anything, my thinking is that it is going to end up being 8 lanes over Agnew and the additional lanes for the rest of the new Crosstown will be entrance and exit lanes to and from just east of Agnew.

    Also, has anyone else noticed how high the Pennsylvania bridge is and how far it's going to have to come down to meet up with Reno Avenue?! It's going to be a 45 degree incline to have to make up for the short distance between the two. Poor planning?! The only reason I can come up with for why they built that so high is because the rail line will have to pass underneath Penn on its own grade separate from the new highway. So it will be interesting to see if Penn will have direct access with Reno.

    That is all for now.

  2. #2

    Default Re: The New I-40 (Construction Updates)

    Yeah, I too am guilty of taking detours to see whats up over there. I have not gone up close though, so if you get pics, I'd be glad to see them.

    If what you're saying is true about the steep incline, that would suck in the winter time. Isn't there a law that restricts how steep the interstate can be at any one point?

  3. #3

    Default Re: The New I-40 (Construction Updates)

    I only have noticed the progress as I drive on the existing I-40 but have not taken much time to see the progress from other angles. Somebody here posted the link to the web-site that has the aerial pictures of the progress. Pretty interesting to see it from the sky. I also went to Little Flower a few months back to see how close the new I-40 will come to this historic church. This was back when the rail people wanted the project to move to accomodate the existing rail lines.
    The view from Pennsylvania looking south is pretty interesting as well. Your right about how tall the bridge is there.

  4. #4

    Default Re: The New I-40 (Construction Updates)

    I've driven by fairly regularly in the past, but not at all in the last few months. I have noticed, coming back from the airport, that a lot of progress has been made, but haven't made the time to check it out up close.

  5. #5

    Default Re: The New I-40 (Construction Updates)

    You got me interested. I drove around there again tonight. Didn't they say that the new crosstown wasn't due to open until 2012? Cause it sure looks to me like they are moving very quickly. I can't imagine at the speed they are going that it will take that long.

  6. #6

    Default Re: The New I-40 (Construction Updates)

    Would love to see some pics. Having been transplanted to the Tulsa area 3 years ago I don't get to follow OKC construction projects the way I used to. Thanks in advance!

  7. #7

    Default Re: The New I-40 (Construction Updates)

    Quote Originally Posted by CCOKC View Post
    Somebody here posted the link to the web-site that has the aerial pictures of the progress. Pretty interesting to see it from the sky.
    I would like to see that link. I've never seen these aerial pictures at all. I once emailed the peeps at okdot to see if they'd put up a live cam anywhere for round the clock photo updates of the construction and they said they had plans to but that was well over a year ago. They're such losers, lol.

  8. #8

    Default Re: The New I-40 (Construction Updates)

    Somewhere there is a good link to the ODOT overlays over the current route etc... showing the current and future highways and boulevard plans.

  9. #9

    Default Re: The New I-40 (Construction Updates)

    Anyone know when they are going to open the Shields bridge again??? Been close to or a little over a yr now that it has been closed.

  10. #10

    Default Re: The New I-40 (Construction Updates)

    ...Somebody here posted the link to the web-site that has the aerial pictures of the progress.

    Anyone know the link?

  11. #11

    Default Re: The New I-40 (Construction Updates)

    Quote Originally Posted by OKCisOK4me View Post
    Are there other people out there like me who like to drive down (or up, or over) every few months and check out the construction of the new Crosstown? Or am I alone on this one?

    I looked through the current 11 pages of this forum and could not find a single thread pertaining to the ongoing construction of this project.

    So if interested, please respond. I went on Saturday to check it out & I was going to go on Sunday and take some pics to hopefully post for those who do care, but I didn't. Anyway, if any of you have taken the time to notice the bridge and bridge piers being constructed over Agnew Avenue, my question to you is, the main bridge...is that all of it? Only because they say that this is going to be a 10 lane project and that sure doesn't look like 10 lanes. There is the little eastbound bridge on the south end of that project that will connect into the future boulevard but I was wondering if they are going to build another bridge (hence, they are currently adding on to the north end of the bridge over May Avenue to either make additional running lanes for the I-44 northbound exit or they are scooting the current I-40 over to be able to make room for tying in the new Crosstown in with the current Crosstown).

    If anything, my thinking is that it is going to end up being 8 lanes over Agnew and the additional lanes for the rest of the new Crosstown will be entrance and exit lanes to and from just east of Agnew.

    Also, has anyone else noticed how high the Pennsylvania bridge is and how far it's going to have to come down to meet up with Reno Avenue?! It's going to be a 45 degree incline to have to make up for the short distance between the two. Poor planning?! The only reason I can come up with for why they built that so high is because the rail line will have to pass underneath Penn on its own grade separate from the new highway. So it will be interesting to see if Penn will have direct access with Reno.

    That is all for now.

    Here's a link: 40 Forward: Oklahoma's I-40 Crosstown Expressway

  12. #12

    Default Re: The New I-40 (Construction Updates)

    OKCisOK4me, I think you're the only one that checks out the progress of the new I-40.

  13. #13
    SouthsideSooner Guest

    Default Re: The New I-40 (Construction Updates)

    Thanks for the link, LordGerald. I wasn't aware of that site. There are a lot of excellent pics that show the progress of this project. The broad views also show that on a grand scale, they are still just getting started.

    It would be nice if some of the public works stimulous dollars coming out of Washington would go to accelerate the time line of this project. This project is about as "shovel ready" as it gets.

  14. Default Re: The New I-40 (Construction Updates)

    Quote Originally Posted by OKCisOK4me View Post
    Only because they say that this is going to be a 10 lane project and that sure doesn't look like 10 lanes.
    I've been thinking the same thing.

    Quote Originally Posted by sgray View Post
    Cause it sure looks to me like they are moving very quickly. I can't imagine at the speed they are going that it will take that long.
    Been thinking this as well.


    I've only really been paying attention to what can be seen from the current I-40, but have been meaning to drive down and get a better look.

    The other thing that has been puzzling me is how the new bridge near Bass Pro fits into this. My best guess it it's the bridge for Lincoln/Byers to cross over the new 40, but it's at an odd angle for that.

  15. #15

    Default Re: The New I-40 (Construction Updates)

    ^
    my thinking is that it's supposed to be part of a cloverleaf that goes from the boulevard that will be created out of the existing i-40 that feeds into the eastbound side of the new i-40.

    -M

  16. #16

    Default Re: The New I-40 (Construction Updates)

    Quote Originally Posted by mmm View Post
    ^
    my thinking is that it's supposed to be part of a cloverleaf that goes from the boulevard that will be created out of the existing i-40 that feeds into the eastbound side of the new i-40.

    -M
    Exactly. Here is a link to the renderings and you can tell that the part you speak of is going to go over the new I-40 from the boulevard and go eastbound.

    http://okc.about.com/gi/dynamic/offs...ial050630b.pdf

  17. Default Re: The New I-40 (Construction Updates)

    Why such a wide bridge for an on-ramp?

  18. #18

    Default Re: The New I-40 (Construction Updates)

    Quote Originally Posted by sgray View Post
    You got me interested. I drove around there again tonight. Didn't they say that the new crosstown wasn't due to open until 2012? Cause it sure looks to me like they are moving very quickly. I can't imagine at the speed they are going that it will take that long.
    The entire project is supposed to be completed in 2012. They are supposed to open the new highway and begin work on the new boulevard in mid 2010 (I think).

    Also, Shields is supposed to be open by midyear.

  19. #19

    Default Re: The New I-40 (Construction Updates)

    Quote Originally Posted by jbrown84
    why such a wide bridge for an on-ramp?
    dunno... maybe some lanes will go to eastbound i-40 and others will empty onto byers?

    Quote Originally Posted by insider
    also, shields is supposed to be open by midyear.
    they need to get more north/south streets opened pronto... right now, i believe penn, exchange, western and shields are all closed.

    -M

  20. Default Re: The New I-40 (Construction Updates)

    Quote Originally Posted by mmm View Post
    dunno... maybe some lanes will go to eastbound i-40 and others will empty onto byers?

    -M
    Upon looking closely at the linked map, it looks like maybe that's the case, but it's not clear.

  21. #21

    Default Re: The New I-40 (Construction Updates)

    Quote Originally Posted by Insider View Post
    The entire project is supposed to be completed in 2012. They are supposed to open the new highway and begin work on the new boulevard in mid 2010 (I think).
    When speaking about the idea of a new Central Park in the State of the City address:

    "Keep in mind, the interstate should be relocated in 2012. The resulting boulevard that will be built along the current interstate alignment should be in place by 2014."

  22. #22

    Default Re: The New I-40 (Construction Updates)

    Quote Originally Posted by metro View Post
    OKCisOK4me, I think you're the only one that checks out the progress of the new I-40.
    Well, considering this is the most popular thread I've ever created, I'd have to disagree with ya ;-) And if you are right, that's okay with me!

    LordGerald, thanks for that link. Guess I don't have to go take pics now--although they do need to update those videos. Notice in the railroad bridge video that Shields is still open. That's gotta be from two summers ago.

    Also downtown OKC looks aesthetically pleasing to my eye in a grainy video that is choppy from a helicopter in the air!

  23. #23

    Default Re: The New I-40 (Construction Updates)

    I just sent them an email. Here it is:

    To whom it may concern,

    Just wondering if these videos will ever be updated. Shields Boulevard is still open in the second video and there are many other things I noticed in the other two videos but I'm sure you guys know that they are old. I know it costs money to do this and maybe you don't have it in place but it sure would be nice to get an update.

    Also, how about a live cam? I emailed someone about this a few years back and they replied 'oh yeah, we're gonna do that. Just pay attention to the local media because we'll be announcing that here pretty quick...blah, blah, blah'. As you may guess, this has not happened yet--three years later. So anyway, just wondering if someone in your department can give a definitive answer on this one.

    The project seems to be moving along pretty swiftly. Any chance that it is to be done before 2012? I want to drive on it before the end of the Mayan Longcount Calendar. ;-)

    Thanks for any information you can provide.

    Sincerely,
    This Guy Here

  24. Default Re: The New I-40 (Construction Updates)

    I was wondering about that new bridge being built just to the SE of Bass Pro Shop. I thought to myself, that can't be the new I-40. Wasn't it suppose to be going the other way? Now I see it was mentioned here that it will be the new Blvd in place of the old I-40. I also noticed that the new I-40 won't be that long, because I saw the other end on the way to Yukon a few months back. I just hope that the new I-40 is further away enough from the river to give enough space for developments.

    How do they plan to connect I-35, I-235, and I-44 to the new I-40?

    Have they dropped the Robinson off-ramp project? It's closed and I figured it was because of the new I-40 project. It would be a waste of money to continue that project, only to have it demolished in a short time.

  25. #25

    Default Re: The New I-40 (Construction Updates)

    Np

Thread Information

Users Browsing this Thread

There are currently 12 users browsing this thread. (0 members and 12 guests)

Similar Threads

  1. new edmond highway
    By metro in forum Suburban & Other OK Communities
    Replies: 18
    Last Post: 11-17-2006, 07:34 PM
  2. Replies: 16
    Last Post: 01-19-2006, 09:07 AM
  3. OU Construction
    By BG918 in forum Suburban & Other OK Communities
    Replies: 14
    Last Post: 11-15-2005, 09:08 AM
  4. Construction at the airport
    By Patrick in forum General Civic Issues
    Replies: 17
    Last Post: 08-09-2004, 07:52 PM

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  
Single Sign On provided by vBSSO