This crossing upgrade was due anyway, but I’m wondering if the project is indicative of other improvements to Santa Fe or maybe even for BNSF’s existing customers. Is there an overarching plan being worked toward?
This crossing upgrade was due anyway, but I’m wondering if the project is indicative of other improvements to Santa Fe or maybe even for BNSF’s existing customers. Is there an overarching plan being worked toward?
What crossing project are you referring to? The closest grade crossing I am aware of is at 16th Street.
Right, the crossing at ~ 30th. I think BNSF is making some other improvements in the Nowers area, which, if accurate, may or may not be related to the grade crossing.
Thanks for the explanation. Was thinking north-south, not east-west across Santa Fe. That crossing is in terrible shape.
That’s what we called the Lincoln lead. Way before I hired out in 1978, the Santa Fe had 15+ industries they serviced on that spur from Nowers yard. After you crossed Santa Fe street (on the railroad crossing in question), there were 3 separate industrial leads, plus 3 piggyback unloading tracks. It was a well thought out operation, as each warehouse had a separate spur from the lead, so one industry could be reached without disturbing another. By the time I started (1978) we still switched Nabisco, Coors(3-5 cars daily), Safeway(10 cars every night), the piggyback ramps, and Carlisle plastic. Now, from what I hear, it’s only Carlisle.
Lincoln lead, that’s a nice little tidbit to know—Thanks!
I know they switch Cytovance pretty routinely, as well. Not sure what part of the drug manufacturing process requires railcars of product, but I’ll bet it represents a lot of pills!
One more memory from the Lincoln Lead. Right before you crossed Santa Fe, next to the last yard track going up to 36th, (called the back lead), was a short spur 3 cars long referred to as the Team track. Team tracks allowed the shipment to be unloaded by the receiver without a dock, just back up the truck. Every year around Thanksgiving, one or two boxcars would arrive with the Christmas trees. When they are ‘wrapped’ up you can get 3-4 truckloads in a boxcar. Which ever switch engine was called to pull the empty car would usually find 4 trees inside for that crew to enjoy.
There are currently 1 users browsing this thread. (0 members and 1 guests)
Bookmarks