    Default Re: I-235 / I-44 Interchange

    From this afternoon (Friday 7/2):











  2. #1877

    Default Re: I-235 / I-44 Interchange

    The 63rd exit photo is confusing for me in that there looks like a large void of space between the pavement and the gravel bed under the pavement. It looks like a gap of 5-6' or so. Not sure I'm seeing it in perspective or it is what it is? Can someone explain this process. Thanks.

  3. #1878

    Default Re: I-235 / I-44 Interchange

    ^^^^Same...confused

  4. #1879

    Default Re: I-235 / I-44 Interchange

    It's an MSE structure. Mechanically Stabilized Earth. It appears that it is hollow, but it is an illusion. Refer to Pete's photo in Post #1789. You can see where they sealed off the northern edge of where they were working on the previous phase. It is covered in a black moisture barrier material. Now that they are ready to proceed further north, they are backfilling the aggregate up against that black "wall". It's not hollow. Just an illusion.

    Quote Originally Posted by Pete View Post



  5. #1880

    Default Re: I-235 / I-44 Interchange

    Quote Originally Posted by catch22 View Post
    It's an MSE structure. Mechanically Stabilized Earth. It appears that it is hollow, but it is an illusion. Refer to Pete's photo in Post #1789. You can see where they sealed off the northern edge of where they were working on the previous phase. It is covered in a black moisture barrier material. Now that they are ready to proceed further north, they are backfilling the aggregate up against that black "wall". It's not hollow. Just an illusion.
    Very helpful! Thanks!

  6. #1881

    Default Re: I-235 / I-44 Interchange

    They have the first level of retaining wall going all the way to the 63rd st bridge so hopefully they will finish all of the NB lanes up pretty soon and have it fully open up past I44 here soon

  7. #1882

    Default Re: I-235 / I-44 Interchange








  8. #1883

    Default Re: I-235 / I-44 Interchange

    The amount of concrete in that photo is wild.

  9. #1884

    Default Re: I-235 / I-44 Interchange

    At its widest point (just south of the 63rd intersection), it's the equivalent of about 15 lanes.

  10. Default Re: I-235 / I-44 Interchange

    wow
    Oklahoma City, the RENAISSANCE CITY!

  11. #1886

    Default Re: I-235 / I-44 Interchange

    Eastbound 44 was down to one lane as they ready the first bridge trusses.















  12. #1887

    Default Re: I-235 / I-44 Interchange











  13. #1888

    Default Re: I-235 / I-44 Interchange

    Nice! 63rd street exit is getting close to completion! Whew, what a massive project this thing has been. Honestly, it seems like they've moved fairly quickly on this. But, I don't commute downtown so for those who do this project may seem like it'll never end.

  14. #1889

    Default Re: I-235 / I-44 Interchange

    Once they finish the 63rd ramp and can complete those northbound lanes, it will no longer necessary to switch the northbound lanes so after the I-44 bridge, that traffic will be up to full speed.

    Then, it will be down to finishing the southbound bridge and it will pretty much be all wrapped up.

    It's hard to imagine how much better traffic will flow through that intersection.

  15. #1890

    Default Re: I-235 / I-44 Interchange

    It looks like the phase reconstructing the westbound ramps between Lincoln and the interchange with less conflict is currently set to start FFY 2023, but I would not be shocked if that got moved forward with some sort of of economic aid package or delayed due to covid budgets

  16. #1891

    Default Re: I-235 / I-44 Interchange

    Quote Originally Posted by Pete View Post
    Once they finish the 63rd ramp and can complete those northbound lanes, it will no longer necessary to switch the northbound lanes so after the I-44 bridge, that traffic will be up to full speed.

    Then, it will be down to finishing the southbound bridge and it will pretty much be all wrapped up.

    It's hard to imagine how much better traffic will flow through that intersection.
    Is there a timeline on when the bridge will be complete vs the whole project? I watched a similar project like this in Fort Worth that took 2 years to complete

  17. #1892

    Default Re: I-235 / I-44 Interchange

    Quote Originally Posted by Ryan View Post
    Is there a timeline on when the bridge will be complete vs the whole project? I watched a similar project like this in Fort Worth that took 2 years to complete
    They have said "this fall".

    I suspect it will be largely complete before the end of the year.

    They have plenty of motivation besides contracts; the state has a big liability due to how unsafe things are now -- way worse before they started construction.

  18. #1893

    Default Re: I-235 / I-44 Interchange

    Quote Originally Posted by Ryan View Post
    Is there a timeline on when the bridge will be complete vs the whole project? I watched a similar project like this in Fort Worth that took 2 years to complete
    If it follows a similar pace of the NB bridge over i44 and the two main lane bridges over the river on this project, probably somewhere around 6 months.

  19. #1894

    Default Re: I-235 / I-44 Interchange

    So I was a bit curious about some striping and lane shifts, maybe someone can explain. The EB-44 off ramp to I-235S & Broadway extension flyover goes from two lanes, then is forced to merge into one for a few hundred feet maybe, and then branches off into two lanes heading north and one heading south. Couple this with a police suv hanging out in the triangle median this morning created quite the confused backup, but even without flashing lights it can backup for no other reason than that one lane merge. Is there any specific reason they did that, perhaps before the Broadway Extension flyover was open, and hopefully are there any plans to re-stripe that small section to avoid this unneeded bottleneck? The section of road seems wide enough to accomodate two lanes of traffic throughout.

  20. #1895

    Default Re: I-235 / I-44 Interchange

    ^

    I believe it is to slow down traffic because it quickly merges with other lanes at the end.

    I suspect when they get everything done and you don't have those hazardous merges, it will be restriped to 2 lanes.

  21. #1896

    Default Re: I-235 / I-44 Interchange

    The NB/SB ramp will be stripped for two lanes upon project completion.

    Click image for larger version. 

Name:	I-44-EB to NB 235.JPG 
Views:	64 
Size:	90.5 KB 
ID:	16994

    Click image for larger version. 

Name:	I-44-EB to NB 235 part 2.JPG 
Views:	108 
Size:	119.3 KB 
ID:	16995

  22. #1897

    Default Re: I-235 / I-44 Interchange

    It's certainly been a giant pain having the new flyover access forced down to one lane with the southbound people too, so it's a relief to see the diagram of it being restriped.

  23. #1898

    Default Re: I-235 / I-44 Interchange








  24. #1899

    Default Re: I-235 / I-44 Interchange

    once those center supports are up and poured ..... the rest of those 2 bridges will go very fast .. ( beams and then fill)

    getting closer and closer to north and south being complete every day ..

  25. Default Re: I-235 / I-44 Interchange

    I'll start out by admitting that I've paid very little attention to this - because it's out in the northern hinterlands beyond NW 50th and it rarely impacts me - but, I mean...there are going to be other flyovers, right? Everyone is talking like this is being buttoned up but I'm seeing no pathway currently being developed for southbound traffic to transition east, nor for westbound traffic to go south. Am I just missing it? Is that another phase, as yet to kick off? The existing cloverleaf portions are going to be demolished, right? Seems like a long time to go without these transitions.

    Edit: never mind. I went back to the very start of the thread and see that the cloverleaf portions are being retained for those transitions I just mentioned. I mean...I don't have a dog in this fight, but that seems antithetical to the whole "we have to make sure traffic is unimpeded and can change directions without slowing down in any way." Oh well.

Thread Information

Users Browsing this Thread

There are currently 13 users browsing this thread. (0 members and 13 guests)

Similar Threads

  1. Weekend Ramp Closure @ NE.23 at I-235
    By Keith in forum Current Events & Open Topic
    Replies: 0
    Last Post: 03-05-2007, 06:28 PM
  2. I-240 / I-35 Interchange
    By oudirtypop in forum General Civic Issues
    Replies: 16
    Last Post: 02-16-2007, 03:23 PM
  3. I-240 Interchange Plans Have Major Flaws
    By JOHNINSOKC in forum General Civic Issues
    Replies: 2
    Last Post: 08-18-2005, 04:11 PM

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  
Single Sign On provided by vBSSO