The reason the traffic is less during construction than before is because people are actively avoiding the interchange.

One thing that will be a problem this spring is thunderstorms will pretty much instantly flood the low-lying area that was already prone to flooding near the rail bridge. This will cause I-235 to be dangerous during heavy rainfall and likely be shutdown for lengthy downpours.