We are about to get our driveway repaired, overlaid and sealed. Part of it is concrete but the asphalt part is in bad shape and that's what we are repairing. We are taking estimates and one puts 2 inches of overlay and is more expensive (duh) than the other, which puts on 1.5 inches.

For this area, is 1.5 inches okay? They come highly recommended.

Thanks.