Quote Originally Posted by Larry OKC View Post
there is probably a diference between it being open and being complete...maybe what they meant, it is the last paving contract before they can open the road to traffic and shut down the old Crosstown? Think they said they have a couple of more years or so of related stuff stuff to do (not counting the Boulevard)
My "complete" does not include the boulevard. The point I was expressing, is that if they're going to open it to full traffic access, the ends will be a knot as each direction of traffic is diverted to one side while they work on connecting the other, so as there may be 10 lanes for the full length (5 in each direction) the ends will be on one side (therefore 2 1/2 lanes in each direction).