    Default Boulevard Funding Developments

    I was looking at the new 8 year work plan the other day and noticed some interesting developments on the funding for The Boulevard. Each year when the 8 year work plan comes out it is tempting to only look at the last year but a thorough study of the entire plan is needed to see what projects have shifted within, been removed from or added to the plan.

    The following projects specifically mention THE BOULEVARD:

    FFY 2012 - I-40 CROSSTOWN: WP 3.5, WEST CONNECTION OF NEW XTOWN WITH THE BOULEVARD $5,000,000 (Pg 36 of 98)

    FFY 2013 - I-40 CROSSTOWN: WP 1.5, BNSF BRIDGE AT BOULEVARD $6,011,125 (Pg 46 of 98)

    FFY 2013 - I-40 CROSSTOWN: WP 4.5, GRADE, DRAIN, BRIDGE & SURFACE THE BOULEVARD FROM BNSF EAST TO I-40 $15,000,000 (Pg 46 of 98)

    FFY 2014 - I-40 CROSSTOWN: WP.1.5 RR WORK FOR THE BNSF BRIDGE AT THE BOULEVARD***WORK ASSOCIATED WITH 17428(25)*** $1,378,918 (This is a bridge rehabilitation project Pg 58 of 98)

    The work plan can be found at this link:
    http://www.okladot.state.ok.us/projm...p2011-2018.pdf

    If you search the 2010-2017 plan the only mention of the word 'Boulevard' is from two projects in Commanche County and obviously have nothing to do with the Crosstown. The 2011-2018 plan returns the results above. If I remember correctly the numbers thrown out for the total cost of The Boulevard were in the neighborhood of $70 - 80 million. It would appear that roughly $27 million of that has been found.
    Last edited by jonno; 08-17-2010 at 11:18 PM. Reason: correct page numbers

Thread Information

Users Browsing this Thread

There are currently 2 users browsing this thread. (0 members and 2 guests)

Similar Threads

  1. New downtown boulevard...
    By BG918 in forum General Civic Issues
    Replies: 94
    Last Post: 11-09-2006, 07:06 PM
  2. Boulevard Cafeteria
    By metro in forum Restaurants & Bars
    Replies: 0
    Last Post: 07-07-2006, 10:58 AM
  3. Charities and federal funding
    By Rev. Bob in forum Current Events & Open Topic
    Replies: 15
    Last Post: 09-28-2005, 10:37 AM
  4. Crosstown funding still an issue
    By Patrick in forum General Civic Issues
    Replies: 0
    Last Post: 06-14-2005, 01:56 PM
  5. Historic Boulevard Cafetaria closing???
    By Patrick in forum General Civic Issues
    Replies: 8
    Last Post: 12-12-2004, 11:58 PM

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  
Single Sign On provided by vBSSO