There is a major election coming up on November 14 regarding the 2023 Go Bond in Moore with several improvements

including the following

Resurfacing NW 27th St from Santa Fe Ave to Eastern Ave Including a new intersection at Shields Blvd and Janeway Ave intersection. Improvements include necessary curb and guttering, storm drainage improvements, sidewalks, streetscape and utility line replacement

shields-27th.jpg


Broadway Ave Improvements from SE 19th St to SE 34th St Improvements include a redesign of the S Broadway, Tower Dr, SE 19th St Intersection

image_2023-09-18_163043698.jpg

s-broadway-eastern-willow-pine.jpg

s-19th-tower-broadway-intersection-eastern-phase-2 (1).jpg

Eastern will also have improvements from Broadway Ave to SW 34th St. SW 34th st from the Little River to Eastern will be repaved also a new intersection with a signal at SW 34th and S Eastern Ave.
sw-34th-little-river-eastern-ave.jpg

Also there will be a Citywide Arterial Repair and Maintenance with improvements on E Main from Broadway Ave to Eastern Ave.

Other Improvements include

  • Upgrading the Intersection at SW 19th St and Santa Fe Ave to have 2 Turn Lanes
  • S Telephone Rd Pavement from SW 19th to SW 34th St



santa-fe-and-sw-19th-st-intersection.jpg

resurfacing-telephone-road_0.jpg

More Information can be fount at the City of Moore website. as well as their YouTube Channel https://www.cityofmoore.com/governme...ovember14_2023
https://www.youtube.com/channel/UCak...1dyEoj7TmLlqHw