Originally Posted by
bchandler02
Update:
The weeks of 5-15 and 5-23 had them out doing the splicing at each pod in the back yards. Final pole construction was also done too.
The week of 5-23 had them on my specific street and the contractor (Trans-Tel) told me to expect to go live within 30 days.
Happy to report that as of 6/6 it is now available for order, and my order is placed. Utility locators showed up on 6/7 and currently waiting for the drop from the pedestal to my house to be done.
Hopefully this helps someone else wondering how long the process will take.