![](http://www.okctalk.com/images/pete/hefner090923a.jpg)
The original clubhouse was built in the 1950s with improvements dedicated in 1964. The new $8 million design by AHMM Architects will be constructed in two phases: a new two-story clubhouse with retail pro shop, grab & go food and beverage, office space, locker/shower rooms and restrooms and a 2nd-level restaurant and bar with a terrace that will provide views of the lake.
A future phase includes a two-story addition and demolition of the existing clubhouse and cart storage facility. The new building will include a banquet room and cart storage.
Funding will come from a 2017 general obligation and other sources.
Construction is scheduled to start in the spring of 2024 and the first phase is to be completed in the fall of 2025.
![](http://www.okctalk.com/images/pete/hefner090923b.jpg)
![](http://www.okctalk.com/images/pete/hefner090923n.jpg)
![](http://www.okctalk.com/images/pete/hefner090923c.jpg)
![](http://www.okctalk.com/images/pete/hefner090923d.jpg)
![](http://www.okctalk.com/images/pete/hefner090923e.jpg)
![](http://www.okctalk.com/images/pete/hefner090923f.jpg)
![](http://www.okctalk.com/images/pete/hefner090923g.jpg)
![](http://www.okctalk.com/images/pete/hefner090923h.jpg)
![](http://www.okctalk.com/images/pete/hefner090923i.jpg)
![](http://www.okctalk.com/images/pete/hefner090923j.jpg)
![](http://www.okctalk.com/images/pete/hefner090923k.jpg)
![](http://www.okctalk.com/images/pete/hefner090923l.jpg)
![](http://www.okctalk.com/images/pete/hefner090923m.jpg)