Plutonic Panda
10-20-2014, 01:56 AM
Getting a major 5.6 million dollar overhaul.
https://scontent-b-dfw.xx.fbcdn.net/hphotos-xpa1/v/t1.0-9/544942_10204038724040932_6653453983692571336_n.jpg ?oh=3772329e163eb01f13b2533121bc04e3&oe=54B9916E
https://fbcdn-sphotos-g-a.akamaihd.net/hphotos-ak-xpf1/v/t1.0-9/10399451_10204038724000931_8954817809614534771_n.j pg?oh=bb3f65883a117d0d2c5d2ad0bb985f98&oe=54F5CFD6&__gda__=1421273513_818c4107621c7e458bf5653235f6b55 b
https://fbcdn-sphotos-f-a.akamaihd.net/hphotos-ak-xfp1/v/t1.0-9/10702211_10204038725720974_173844864400843479_n.jp g?oh=8841c991423baeebb843eac58d54390e&oe=54EF671A&__gda__=1424676682_66cb7302c84206f50b43729b1b78c45 8
Now that the revelers at this year’s Oktoberfest have come and gone, it’s time to put a new face on River West Festival Park.
A long-planned, $5.6 million overhaul of the park on the west bank of the Arkansas River is scheduled to begin Nov. 3. Once work is completed late next year, the park will have a new stage, trail, playground equipment, a storage facility and restrooms.
Also, existing onsite parking will be expanded.
“The intent is to make the park better for festivals because that is kind of our bread and butter out there,” said River Parks Executive Director Matt Meyer.
Much of the work on the park will take place underground, where electrical and irrigation systems will be added and the above-ground electrical units removed, Meyer said. The park’s basketball courts are also being removed.
River West Festival Park was constructed in the late 1970s using an $821,000 federal economic development grant. The park is best known as the home of Oktoberfest, but it is also the venue for a number of other events throughout the year.
The idea of improving the park has been around since at least 2006, when voters approved third-penny sales tax funding to do the work.
The renovation was scheduled to begin after last year’s Oktoberfest but was postponed after the city determined a planned bridge could be susceptible to flooding.
That — and the need for an on-site storage facility — prompted a change in the park’s design.
“Once the city decided we could not do the bridge, the design implications rippled throughout the rest of the park,” said Dominic Spadafore, an architect for Dewberry, which designed the renovation project.
- read more here: River West Festival Park redesign to begin in November - Tulsa World: Homepagelatest (http://www.tulsaworld.com/homepagelatest/river-west-festival-park-redesign-to-begin-in-november/article_13ff90e4-2dc8-5d72-93cc-c60a9139e581.html)
https://scontent-b-dfw.xx.fbcdn.net/hphotos-xpa1/v/t1.0-9/544942_10204038724040932_6653453983692571336_n.jpg ?oh=3772329e163eb01f13b2533121bc04e3&oe=54B9916E
https://fbcdn-sphotos-g-a.akamaihd.net/hphotos-ak-xpf1/v/t1.0-9/10399451_10204038724000931_8954817809614534771_n.j pg?oh=bb3f65883a117d0d2c5d2ad0bb985f98&oe=54F5CFD6&__gda__=1421273513_818c4107621c7e458bf5653235f6b55 b
https://fbcdn-sphotos-f-a.akamaihd.net/hphotos-ak-xfp1/v/t1.0-9/10702211_10204038725720974_173844864400843479_n.jp g?oh=8841c991423baeebb843eac58d54390e&oe=54EF671A&__gda__=1424676682_66cb7302c84206f50b43729b1b78c45 8
Now that the revelers at this year’s Oktoberfest have come and gone, it’s time to put a new face on River West Festival Park.
A long-planned, $5.6 million overhaul of the park on the west bank of the Arkansas River is scheduled to begin Nov. 3. Once work is completed late next year, the park will have a new stage, trail, playground equipment, a storage facility and restrooms.
Also, existing onsite parking will be expanded.
“The intent is to make the park better for festivals because that is kind of our bread and butter out there,” said River Parks Executive Director Matt Meyer.
Much of the work on the park will take place underground, where electrical and irrigation systems will be added and the above-ground electrical units removed, Meyer said. The park’s basketball courts are also being removed.
River West Festival Park was constructed in the late 1970s using an $821,000 federal economic development grant. The park is best known as the home of Oktoberfest, but it is also the venue for a number of other events throughout the year.
The idea of improving the park has been around since at least 2006, when voters approved third-penny sales tax funding to do the work.
The renovation was scheduled to begin after last year’s Oktoberfest but was postponed after the city determined a planned bridge could be susceptible to flooding.
That — and the need for an on-site storage facility — prompted a change in the park’s design.
“Once the city decided we could not do the bridge, the design implications rippled throughout the rest of the park,” said Dominic Spadafore, an architect for Dewberry, which designed the renovation project.
- read more here: River West Festival Park redesign to begin in November - Tulsa World: Homepagelatest (http://www.tulsaworld.com/homepagelatest/river-west-festival-park-redesign-to-begin-in-november/article_13ff90e4-2dc8-5d72-93cc-c60a9139e581.html)